CBAM does not charge for all embedded emissions. EU producers still receive free allocation, so imports get a matching deduction, set by the benchmark, the CBAM factor and the CSCF.
- Certificates per tonne = SEE − SEFA × CBAM factor × CSCF.
- Default path: SEFA = column-B benchmark, route as shown in the default-value table ((C) for China carbon-steel fasteners).
- Actual path: SEFA = column-A process benchmark + precursor use × precursor SEFA.
- CBAM factor 97.5% in 2026, 0 in 2034; CSCF set at 100% for 2026–2030.
1. The formula
Certificates per t = max(0, SEE − SEFA × CBAM factor × CSCF)
Cost per t = certificates × price − verified carbon price paid at origin
SEE is specific embedded emissions (default values marked up); SEFA is the specific embedded free allocation. Structure from Implementing Regulation (EU) 2025/2620 and Commission Guidance No. 4.
2. Column A and column B
| Column A | Column B | |
|---|---|---|
| Meaning | Own-process benchmark only | Whole-chain benchmark incl. precursors |
| Used with | Actual data | Default values |
| 7318 carbon steel | 0.038 | (C) 1.364 / (D) 0.475 / (E) 0.066 |
| 7318 stainless | 0.038 | (1) 1.154 (2026–27) / (2) 1.116 (2028–30) |
| 7308 | 0.112 | (C) 1.491 / (D) 0.567 / (E) 0.141 |
Which route on default values? Guidance No. 4, section 2.2.1.2: the route shown in the last column of the default-value table (Annex I to 2025/2621) for that country and code. China rows for carbon-steel 7318, 7308 and 7326 show (C), so the default path deducts (C) even for EAF producers.
3. CBAM factor and CSCF
The CBAM factor is the share of EU free allocation still granted, falling each year under Article 10a(1a) of the ETS Directive (Guidance No. 4, table 2-1). The cross-sectoral correction factor for 2026–2030 has been published in Implementing Decision (EU) 2026/1862 (cited in Guidance No. 4) at 100%, i.e. 1.0.
| Year | CBAM factor | Default mark-up | 7318 15 82 certificates per t |
|---|---|---|---|
| 2026 | 97.5% | 10% | 5.6826 |
| 2027 | 95.0% | 20% | 6.3542 |
| 2028 | 90.0% | 30% | 7.0599 |
| 2029 | 77.5% | 30% | 7.2304 |
| 2030 | 51.5% | 30% | 7.5850 |
| 2031 | 39.0% | 30% | 7.7555 |
| 2032 | 26.5% | 30% | 7.9260 |
| 2033 | 14.0% | 30% | 8.0965 |
| 2034 | 0.0% | 30% | 8.2875 |
China default 6.375 and column B (C) 1.364; price not applied. Assumes no further corrections to the default values or benchmarks.
The same shipment needs 1.46× as many certificates in 2034 as in 2026. Even at a flat price, default-value cost rises every year.
4. Deduction on the actual path
Guidance 5d example 3: carbon-steel screws, column A 0.038, steel use 1.176 t/t, precursor SEFA 1.242. SEFA = 0.038 + 1.176 × 1.242 = 1.4986; × 0.975 = 1.4611. The precursor SEFA enters unadjusted; the factor is applied once at the end.
Official sources
- European Commission – Guidance No. 4: free allocation adjustment (14 Aug 2026; CBAM factor Table 2-1, section 2.2.1.2)
- European Commission – CBAM benchmarks Excel (Implementing Regulation (EU) 2025/2620, Annex point 5)
- Implementing Regulation (EU) 2025/2620 (free allocation adjustment)
- Implementing Decision (EU) 2026/1862 (cross-sectoral correction factor 2026–2030)
- European Commission – CBAM default values, v2 Excel (6 Aug 2026, correcting Implementing Regulation (EU) 2025/2621 via 2026/1740)
- European Commission – Guidance No. 5d: iron and steel (14 Aug 2026; example 3, tables 4-12 to 4-14)
- European Commission – Guidance No. 3: methods for calculating embedded emissions (14 Aug 2026; mark-ups 10/20/30%)
Related guides
- CBAM default values for CN 7318 fasteners from China, and the 2026 cost per tonne
- CBAM actual emissions vs default values for fasteners
- CBAM certificate price 2026: the official quarterly prices and how to use them
- CBAM for steel structures (CN 7308): how the cost is calculated
- CBAM 7326: China default values and cost per tonne
- CBAM 50-tonne threshold and the 2027 timeline